150V 45A MPPT - roll your own


Author Message
Revlac

Guru

Joined: 31/12/2016
Location: Australia
Posts: 1309
Posted: 07:12am 20 May 2026      

The 5Kw Aurura choke, leave that one together it is practically good to go for the Charge controller, the 2 coils can be joined but the polarity needs to be checked with the an LCR Meter, forgot what the numbers are, you can find that out later.