Posted: 01:12am 16 Sep 2021      

@Mixtel90
Same in Aus. When the nominal voltage changed from 240 to 230 the percentage over and under voltage limits were also changed resulting in exactly the same actual limits. The distribution companies were free to do nothing, and they did nothing.
The problem of miss-match between solar / wind output and demand is slowly being addressed by adding large battery banks to the grid.