Ajarvis8 Newbie
 Joined: 04/05/2024 Location: United StatesPosts: 3 |
| Posted: 10:55am 09 May 2024 |
|
|
|
No batteries planned yet. This will be a load sensing grid tied setup. The 90v was with a 600w load. We are going to increase the load to over 1000w and remeasure the voltage, but the plan is to require to Delta reddit Electrical engineering has confirmed it should give me 58% of the current voltage.
The inverter we are planning will have a dump resistor. |