Bryan1
 Guru
 Joined: 22/02/2006 Location: AustraliaPosts: 1415 |
Posted: 03:37am 09 Jun 2024 |
|
|
|
GRRRRRRR connected up the 1.5Kw this morning and after getting this second MPPT going found it went into fault mode as the input voltage was 110 volts So it does look like I'm going to have to rewire all the panels in parallel and wouldn't it just figure got 5 M4 connectors left and I need 6 of them.
So Murphy has been laughing at me all morning like at every turn a curve ball was thrown in.
So a trip into MM next week to get more parts and another day on the roof to get the work done.
Regards Bryan |