Builiding of a complete 6kW PV inverter with MPPT chargers


Author Message
phil99

Guru

Joined: 11/02/2018
Location: Australia
Posts: 2400
Posted: 08:13am 09 Jun 2024      

Another possible thing to try is to move the secondary winding earth point to the output side of the EMI filter.

As the metering and feedback are taken from there it might minimize any interference.
It may also do nothing, but there is only one way to know for sure.