nickskethisniks Guru
 Joined: 17/10/2017 Location: BelgiumPosts: 462 |
Posted: 07:35am 17 Jul 2024 |
|
|
|
I like your idea Mike.
This leaves the main controller as it is.
A software option could be:
Controlling the second parallel inverter (without the pwm) by another nano (a lite version of the allready existing controller for example) wich could have all the extra temperature /current meterings to ensure proper service.
For my personal case I could start making a moderate 4kW nominal inverter as backup.
And then since my ozz inverter holds a real "beast transformer" I could start experimenting with a double powerstage driving it. After each stage I add inductors in series with the transformer. This would be another usecase for the ws concept. Edited 2024-07-17 17:43 by nickskethisniks |