Getting closer, sanding, edge round-over and stain / oil to go.
I will start the wire up in a day or so, then shut down the current Inverter and transfer that 3 stack toroid into the new cabinet.
I'll be using a temporary control panel that I can botch up and finalize the layout with before transferring the final design over to the good control panel, but I will have the inverter fully running with the ugly temp panel before that.
I'll allow myself two days to get it up and running with both power stages paralleled, once I'm happy with that, I'll move on to adding Wiseguys Dual power control exactly as he designed it, and giving that a good test and gathering some readings under various loads for a dual unit.