Good money after bad - Solar upgrade time


Author Message
wiseguy

Guru

Joined: 21/06/2018
Location: Australia
Posts: 1336
Posted: 05:17am 01 May 2025      

Something else that affects the stability of each half cycle of the sine is how well the timing variations are matched between the 4 FET drive optocouplers.

There are propagation delays (for both, high going and low going events) + a distortion component in the optocouplers. These are specified at 25 Deg C and no doubt can also vary with temperature, along with the capacitor stability for the dead time capacitor in parallel with the Opto LEDs.  Now consider the 4 combined FETs on/off rise & fall time for each leg of the bridge as well.

So is it any wonder that there may be slight differences between the integration of the total switching on and off times for each half cycle? I think its actually surprising that there are only minimal issues. Perhaps prior matching of each sides of the bridge H & L Opto couplers timing would pay good dividends - maybe some builds fluke the matching better than others?