phil99 Guru Joined: 11/02/2018 Location: AustraliaPosts: 3407
Posted: 06:01am 22 Nov 2024
Other than those certified for solar installation work, probably not many these days.
Long, long ago I was a sparky when there was still some reticulated 200VDC in Melbourne CBD for lifts in old buildings. The first 2 years of trade school was all DC and included theory and prac. on all types of non-electronic DC motor and generator.
When the State Electricity Commission was privatised the new distribution companies were given the power to set "safety" regulations beyond those in AS/NZS 3000. They have a vested interest in making it difficult to avoid buying their power.
That said there is a place for regulations for the safe installation of large batteries.
Doing cell volts and SG readings on 460V banks (200 cells in series) made me a bit nervous. All exposed terminals. The biggest one delivered 50kW for 12 hours on a load test. No aluminium ladders allowed in that room.