CraziestOzzy Senior Member Joined: 11/07/2008 Location: AustraliaPosts: 152
Posted: 02:32am 02 Oct 2025
True, I'm taking heaps of photos of progress, going as far as showing depth of holes dug for posts. Once everything ready to go, get a legit sparkie to sign it off even though I don't need one as it keeps the missus happy and the insurance company. Basically a permanent and dated record.
With the Standards set against the DIY end user, I do note that was has not changed is that when a new Standard comes in existing systems are allowed to exist as long as you can replace "like for like".
Going to have a sticky at your previous posts, but what was your solution to off grid with multiple redundancy?