MrBungle Newbie
 Joined: 07/10/2005 Location: AustraliaPosts: 34 |
Posted: 05:00pm 14 Nov 2005 |
|
|
|
Couple of inches eh?
I honestly don't think you could have bettered that using trig and a homemade protractor, so ... same.
Edit: Oh hey, I just had a very delayed idea, what if the two steadying
wires are on the level ground, and the lift/drop wires are on the
slope? Their tie-down/pulley points don't have to be as perfectly positioned right? Too late now I spose.
Edited by MrBungle 2005-11-16 |