OZeTrade’s F&P VAWT Concept


Author Message
ozetrade

Regular Member

Joined: 15/10/2005
Location: Australia
Posts: 59
Posted: 12:42pm 10 Nov 2005      

Thanks Glenn,

Just need to confirm a couple of things:

  •  - connect NEG DC from windmill
  •  L4 NEG to shunt load
  •  L3 POS to shunt load
  •  L2 NEG to battery
  •  L1 POS to battery 
  •  + connect POS DC from windmill

Connect a bridge at the "Link for 12v use" to use board foe 12v.

Have I got it right?


Greg
Just North of Brisbane in Redcliffe
OZeTrade.net