Posted: 03:37am 09 Jun 2024
Copy link to clipboard 
Print this post

GRRRRRRR connected up the 1.5Kw this morning and after getting this second MPPT going found it went into fault mode as the input voltage was 110 volts   So it does look like I'm going to have to rewire all the panels in parallel and wouldn't it just figure got 5 M4 connectors left and I need 6 of them.

So Murphy has been laughing at me all morning like at every turn a curve ball was thrown in.

So a trip into MM next week to get more parts and another day on the roof to get the work done.

Regards Bryan
 
Godoh
Guru

Joined: 26/09/2020
Location: Australia
Posts: 396
Posted: 08:26am 09 Jun 2024
Copy link to clipboard 
Print this post

Hi Bryan, I connect my panels as 2 in series then parallel the banks up. That way I keep under the maximum ( low voltage) level for non licenced wiring. I use two or 3 way parallel connectors to parallel the banks. They are pretty fast and easy to use.
Sounds like you are having fun,
Pete
 
Bryan1

Guru

Joined: 22/02/2006
Location: Australia
Posts: 1219
Posted: 05:33am 15 Jun 2024
Copy link to clipboard 
Print this post

Well wouldn't it go figure told my wife NOT to use the genset until I got a new extension lead as the last one shorted out and what did she do blow up the charger with that shorted cable.  

So now got my shed charger which only for a 260AH battery and outputs around 35 amps, now what surprised me that 4Kw genset lasted around 9 hours of running the charger. So with not too much loading it's just purring along.

I decided to get a quote on a 48 volt 1000AH forklift battery and it was around that 10K figure I thought it may be. Today I sent an email for a new charger to suit that 600AH battery thats been powering the home for over a decade.

When it's day after day of pea soup for weather no amount of solar will help so that 4Kw motor conversion project may just need to get finished and up in the air. But with a good 100 metre wire run finding the right cable will be the first job and for digging the trench that new tractor is looking better by the day.

Regards Bryan
 
Godoh
Guru

Joined: 26/09/2020
Location: Australia
Posts: 396
Posted: 07:35am 15 Jun 2024
Copy link to clipboard 
Print this post

Hi Bryan, what sort of current does the underground cable have to carry.
100 metres is a fairly long run.
I am guessing that you are going to run 240 from the generator to the battery charger that is 100 metres away. If you are pulling 15 amps through you underground cable you would need to use 6mm cable at least. That would allow you to pull around 20 amps at 230 volts max.
Sounds like you have your work cut out.
Maybe it is also worth pricing VRLA batteries as well as Fork Lift batteries.
It sounds like your power needs are fairly high
Cheers
Pete
 
Bryan1

Guru

Joined: 22/02/2006
Location: Australia
Posts: 1219
Posted: 02:41pm 17 Jun 2024
Copy link to clipboard 
Print this post

Hi Pete, When I load tested this conversion in my lathe all those years ago when it got to cut in my VFD complained of over current and my lathe was in 5:1 back gear. I saw a glimpse of 89 amps on the clamp meter. I setup 2 truck batteries for 24 volts as the load and used a 100 amp bridge rectifier.

Did 3 off load tests and the 100 amp bridge rectifier let out the magic smoke on the 3rd test and every reading on the cutin was around 90 amps.

Now with these motor conversions one can only get what on the name plate and with mine being 4Kw I do think 2-3 Kw would be the working range.

I do intend to bring down the current with wild AC and rectify at the shearing shed where the new power base is going to be setup.

I do need to get some hot water heaters to use as as a dumpload as when the batteries are fully charged the current has to go somewhere.

There is a few scrap yards in town so I do need to get down there and have a look and see what they have and I'm thinking 400 amp arc welding cable as the minimum so with a 3 runs yes it is a bit of cable.

Regards Bryan
 
Godoh
Guru

Joined: 26/09/2020
Location: Australia
Posts: 396
Posted: 12:49am 18 Jun 2024
Copy link to clipboard 
Print this post

Hi Bryan, I don't get why you want to use welding cable. That seems very excessive for what you are doing.
From what I read in your posts you are sending AC from the generator shed to the other shed. Then charging batteries with that.
So there must be an inverter at the shed where the batteries are.
My thoughts are that you would be better off adding a capacitor bank in parallel with the shed batteries to help with starting current.
Maybe I am not understanding your setup.
The price of welding cable, even if you could get it in 100 metre lengths would be astronomical.
Also why three cables. is your converted motor 3 phase?

Pete
 